Questions LLC
Login
or
Sign Up
Ask a New Question
Mathematics
Probability and Statistics
Data Analysis
What will be the next. Result of wining machine 85 20 34 65 90-78 18 83 27 17
1 answer
You are probably dealing with a random number generator. There is no way of knowing.
You can
ask a new question
or
answer this question
.
Similar Questions
in 5/90 there was draw like
wining machine 69-29-62-72-32 = 60-17-35-16-48 the next draw was wining machine 11-25-38-89-57 =
Top answer:
To predict the best numbers for the next draw based on the information provided, you would need to
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
To find the machine with the highest efficiency, we need to calculate the efficiency of each machine
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine C
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
The machine with the highest efficiency is Machine C.
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine D
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine C
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
The efficiency of a machine is determined by the ratio of output work to input work. For machine A,
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
machine A
Read more.
Use the table to answer the question.
Machine Output Work (J) Input Work (J) A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000
Top answer:
Machine C
Read more.
Machine Output Work (J) Input Work (J)
A 750 1,500 B 1,000 4,000 C 450 600 D 3,000 5,000 Which machine has the highest
Top answer:
The efficiency of a machine is calculated by dividing the output work by the input work and
Read more.
Related Questions
The efficiency to machine is 75% , if this machine raises a load of 150kg , through a vertical height of 20m,calculate the
1. A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 60
A machine with velocity ratio 5 requires 1000J of work o raise a load of 600N through a vertical distance of 1.25m
find i.work
A company makes three products X, Y and Z. Each product requires processing by three machines A, B and C. The time required to
Oaktree Company purchased a new machine and made the following expenditures:
Purchase price $45,000 Sales tax 2,200 Freight
Force and Work Unit Test
9 of 129 of 12 Items Question Use the table to answer the question. Machine Output Work (J) Input Work
Use the article by Eberhard jacket Downfall or liberation history today may 1995
Where all Germans confident of their country
Kiddy Toy Corporation needs to acquire the use of a machine to be used in its manufacturing process. The machine needed is
Which of the following terms is used to describe a machine’s ability to take a large amount of data and to learn from it,
A machine is under consideration for investment. The cost of the machine is P25,000.00. Each year it operates, the machine will