Wednesday
May 22, 2013

Homework Help: Physics

Posted by Sara H on Tuesday, December 18, 2012 at 7:03pm.

A worker applies a constant force of magnitude F = 339 N on a crate in a direction è = 26.1o above the horizontal as he pulls it across a level floor through a distance of s = 7.20 m. The mass of the crate is m = 53 kg and the coefficient of kinetic friction between the floor and the crate is ìk = 0.255.

1) Calculate the amount of work done on the crate by the worker
2) Calculate the amount of work done on the crate by friction
3) Calculate the net force acting on the crate in the x-direction
4) Use the net force to calculate the total work done on the crate
5) Assuming the crate starts from rest, calculate the final velocity of the crate

my problem is finding number 1 and 2 and 3.. please explain how to do this for me! thank you!

btw i found that both the amount of work done on the crate by normal force and gravity are both 0.

No one has answered this question yet.

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

Physics - A worker pushes 25Kg crate a distance of 5m along a level floor at ...
Physics - Question # 1 Marks = 12 A worker pushes 25Kg crate a distance of 5m ...
PHYSICS - A factory worker pushes a 30.7 crate a distance of 4.0 along a level ...
physics - To push a 25.0kg crate up a frictionless surface incline angled at 25 ...
Physics - A worker pushing a 35.0-kg wooden crate at a constant speed for 13.7 m...
physics - i apply an 800 N force to the crate a. how long would it take the ...
physics - i apply an 800 N force to the crate a. how long would it take the ...
Physics - A wood crate is sitting on a concrete floor. The crate has a mass of 7...
physics - to push a 25 kg crate up a 27 incline, a worker exerts a force of 120 ...
Physics.. please help!!!!! - A crate is pulled to the right with a force of 80 N...

For Further Reading

Search
Members
Community