A time study of operations yielded the following observed times for one element of the job; the analyst gave a performance rating of 1.13. Using an allowance of 20%, determine the appropriate standard time for this operation.
Observations Time, x
1 1.12
2 1.15
3 1.16
4 1.12
5 1.15

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

Operations Management - A job has a normal time of 12 minutes a performance ...
Math - The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-...
Advanced Production - The data in the following table represent time-study ...
math - Given the following information, determine the sample size needed if the ...
Accounting - The Dubuque Cement Company packs 80-pound bags of concrete mix. ...
Math - The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-...
business - An estimate of the time required to perform a certain job is needed. ...
Linear Programming - A Company wishes to assign six of its workers to six ...
Statistics - 4) The table below shows the study times and test scores for a ...
Statistics - 4) The table below shows the study times and test scores for a ...

Members