It takes one man one day to dig a 2m x 2m x 2m hole. How long does it take 3 men working at the same rate to dig a 4m x 4m x 4m hole?

x = rate of one man = 23 m3/ 1 day = 8m3/day
3x = rate of three men = 3(8m3/day) = 24m3/day
64m3/(24m3/day) = 2 2/3 days
Is this correct?

No one has answered this question yet.

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

ap chemistry - for the following, mix the equal volumes of one solution from ...
MATH - Which of the following equations has the given solution set? Solution set...
math - Which of the following equations has the given solution set? Solution set...
math - Which of the following equations has the given solution set? Solution set...
algebra - A homeowner wishes to insulate her attic with fiberglass insulation to...
Math - Is this right? Simplify by removing factors of 1. 2m^2+2m/10m^2+4m My ...
chemistry - Calculate [H3O] in the following solutions. a)4.0×10&#8722...
algebra - 5(2m+3)-(1-2m)=2[3(3+2m)-(3-m)] Does this have a solution? I can only ...
Math - This irregular shape has 2m,2m,2m, 3m, 4m, 7m _2m_ _2m_ | |2m__3m_...
calculus - A conical tank has height 3m and radius 2m at the top. Water flows in...

For Further Reading

Search
Members
Community