Posted by Merlin on Tuesday, April 26, 2011 at 9:27pm.
Assuming no losses?
power= work/time= weight*distance/time= weight*velocity
weight= power/velocity
change velocity to m/s
Related Questions
Physics - A construction crew pulls up an 87.5 kg load using a rope thrown over ...
Physics - A construction crew pulls up an 87.5-kg load using a rope thrown over ...
Physics - A construction crew pulls up an 87.5-kg load using a rope thrown over ...
physics - a man has only 4 simple pulleys to lift a heavy load of 6000N. in ...
Physics - (a).A 220-kg sleigh is pulled by one horse at constant velocity for 0....
Science - trying to lift an 8-N load that is attached to a fixed 2 pulley system...
physics - A small motor runs a lift that raises a load of bricks weighing 916 to...
Physics - A dc electric motor found in the lab was being examined by a student. ...
Physics - pulley - A construction crew pulls up an 87.5-kg load using a rope ...
Physics - An electric motor is rated to have a maximum power output of 0.72 hp. ...
For Further Reading