Thursday
March 26, 2015

Homework Help: Physics

Posted by Nicole on Wednesday, October 15, 2008 at 9:30pm.

A 100-N boulder is sitting on a shelf 0.5 meters above the floor.

If the boulder is moved 1.0 meters horizantally across the shelf how much work has been done on the boulder?

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

Physics - A 100-n boulder is sitting on a shelf 0.5 meters above the floor. If ...
Physics - A 100-n boulder is sitting on a shelf 0.5 meters above the floor. How ...
Physics - A 100-n boulder is sitting on a shelf 0.5 meters above the floor. How ...
Physics - A 100-n boulder is sitting on a shelf 0.5 meters above the floor. What...
Physics - A 100-n boulder is sitting on a shelf 0.5 meters above the floor. What...
physics - A large boulder sits at the top edge of a cliff, this is boulder A. A ...
Physics - The road runner drops a boulder from a 53 meter high building. When ...
physics - 7. A 2000.0 kg boulder sits on the top of a 50.0 m cliff. As the ...
physics - A boulder with a mass of 2,500 kg on a ledge 200 m above the ground ...
ALGEBRA - A catapult launches a boulder with an upward velocity of 92 m/s. The ...

Members