Posted by jane on Monday, February 11, 2008 at 5:46pm.
The useful work done (the potential energy increase) is M g H = 392 J
The efficiency is (Work out)/(Work in) = 392/500 = __ %
Related Questions
physical science - if an engine must do 500 joules of work to pull a 10 kg load...
science - if an engine must do 500 joules of ork to pull a 10 kg load up to a ...
Physical Science - If an engine must do 500 joules of work to pull a 100 N load ...
Science check - I was wondering if someone could check the problems for me? ...
Physical Science - How much work is needed to raise a 110-kg load of bricks 12 m...
Physical Science - How much work is needed to lift an object with a mass of 51....
physics - a giant crane was tested by lifting 2.232*10^6 kg load.find the ...
physics - a giant crane was tested by lifting 2.232*10^6 kg load.find the ...
physics - in which of the following is the most work being done by roy and which...
physics - 1. How far (in meters) must a 600 kg pile driver fall, if it is to do ...
For Further Reading