Thursday
July 24, 2014

Homework Help: math

Posted by Luca on Saturday, June 9, 2007 at 3:00am.

A and B these 2 companies are fixing a road,A fixes 62% of the road,which is 360 meters more than B fixed.How long is this road?

Let X be the road length.
a is fixed by company A.
b is fixed by company B.
a + b = x
a - b = 360
a = 0.62 x

2a = x + 360 (from adding the first two equations)
1.24 x = x + 360
0.24 x - 360
x = 360/0.24 = 1500 m

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

physics - an auto, moving too fast on a horizontal stretch of mountain road, ...
Physics, HELP - AN auto, moving too fast on a horizontal stretch of mountain ...
Math - At one point on a mountain road, the elevation is 1250 meters. Three ...
Physics - A car with a mass of 900 kg moves along a road at a 89 km/hour at ...
trig - A road runs from the base of a mountain. From two points 235 meters apart...
trig - A road runs from the base of a mountain. From two points 235 meters apart...
trig - A road runs from the base of a mountain. From two points 235 meters apart...
Advanced Algebra Honors - A rectangular garden 50 m. long and 34 m. Wide is ...
Mathematics - A rectangular garden 50 m long and 34 m wide is surrounded by a ...
trig - a hedgehog wishes to cross a road without being run over. he observes the...

Search
Members