Friday
April 25, 2014

Homework Help: Physical Science

Posted by Tammy on Tuesday, January 9, 2007 at 6:08pm.

How much work is needed to raise a 110-kg load of bricks 12 m above the ground to being under construction?


work in joules= weight*height

where weight is mass*9.8m/s^2

Answer this Question

First Name:
School Subject:
Answer:

Related Questions

science - How much work is needed to raise a 110-kg load of bricks 12m above the...
Biomechanics - An 88.9 kg weight lifter is required to perform a snatch movement...
PIs 267 - How much work is need to raise a 110 kg loag of bricks 12m above the ...
Physics - Question: Two masses 2.2 Kg and 3.2 Kg connected by a rope over a ...
physics - if the pulleys are massless and frictionless and the rope is of ...
Science - A construction worker exerts 209N to move a load of bricks a distance ...
Physical Science - How much work is needed to lift an object with a mass of 51....
Physics - If you drop a 1.0 kg weight from a height of 1.0 m, how many joules of...
physical science - if an engine must do 500 joules of work to pull a 10 kg load...
Phyics help - I have a few physics questions: 1. How much mechanical work is ...

Search
Members